Understanding Risk-Based Testing: Identifying, Evaluating, and Managing Project Risks

Understanding Risk-Based Testing: Identifying, Evaluating, and Managing Project Risks

Introduction to Risk-Based Testing

Risk is the possibility of an undesired outcome or occurrence. When a problem or issue arises that could negatively impact stakeholders’ perception of a project’s quality or its successful completion, a risk is present.

In scenarios where the primary impact of risk is on the quality of the product, these issues are categorized as product risks, quality risks, or product quality risks. Managing these risks is crucial to ensuring the overall success and reliability of the project.

Understanding Risk-Based Testing

Risk-based testing involves selecting test conditions based on identified risks to product quality. These identified risks help determine how much effort should be allocated to testing specific conditions and prioritizing the creation of test cases.

Various testing techniques, each with different levels of documentation and formality, can be employed in risk-based testing. The primary goal is to reduce quality risks to an acceptable level.

It’s important to note that achieving zero quality risk is nearly impossible.

The Process of Risk-Based Testing

In risk-based testing, product and quality risks are identified and assessed during a risk analysis conducted with stakeholders. Following the risk analysis, the testing team proceeds with test design, implementation, and execution, all aimed at minimizing identified risks.

Quality, in this context, refers to all product features, characteristics, and behaviors that could impact the satisfaction of users, customers, and other stakeholders.

When defects are discovered before a product’s release, testing has successfully reduced quality risks by identifying these issues and providing methods for addressing them.

Examples of Quality Risks

  • Delayed response to user actions: A non-functional risk related to performance.
  • Reports with incorrect results or calculations: A functional risk concerning accuracy.
  • Complicated user interface and input fields: A non-functional risk affecting usability and system adoption.

If no defects are found during testing, it confirms that the system performs correctly in the tested conditions, thereby reducing quality risks.


Techniques for Risk-Based Testing

  • Risk-based testing can be implemented using various techniques that differ in the level of documentation, type of documentation, and the degree of formality. Each technique is designed to effectively address and mitigate the specific risks identified during the risk analysis process.

Key Steps in Risk-Based Testing

Risk-based testing involves four key steps:

  1. Identifying Risks

  2. Assessing Risks

  3. Mitigating Risks

  4. Managing Risks

These activities aren’t strictly sequential; instead, they often overlap. In the following sections, we’ll dive deeper into each of these steps. The costs associated with these activities contribute to the overall cost of quality.

For optimal efficiency, the risk assessment and identification team should include members from all stakeholder groups, whether they represent the entire project or the product development team.

However, in practice, some stakeholders may represent additional stakeholder groups.

Consider this scenario: When developing software for the mass market, a small sample of potential customers might help identify defects that could impact how they use the software most frequently.

In this case, the small group of potential customers serves as a representative for the entire customer base.

Testers should also participate in the risk identification process, leveraging their expertise in quality risk analysis and defect detection.

Effective Methods for Identifying Project Risks

Stakeholders have various methods at their disposal to effectively identify project risks, including:

  • Interviewing subject matter experts

  • Conducting independent reviews

  • Utilizing existing risk templates

  • Holding retrospective meetings in ongoing projects

  • Facilitating risk workshops

  • Brainstorming sessions with all stakeholders

  • Creating and applying checklists

  • Reflecting on previous project experiences

Involving a broad cross-section of stakeholders in the risk identification process significantly enhances the likelihood of uncovering the most critical quality risks. The role of stakeholders in risk-based testing is crucial.

The risk identification process often uncovers additional issues that may not directly impact product quality but are still important, such as general product concerns or documentation-related issues like requirement specifications.

It’s essential to manage project risks holistically, extending beyond just risk-based testing, to ensure comprehensive project success.

How to Effectively Assess and Manage Risks

Once risks have been identified, the next step is their assessment. Risk assessment involves analyzing and evaluating the identified risks to understand their potential impact and likelihood.

Key activities in risk assessment include:

  • Classifying Risks: Categorizing each risk based on specific criteria.

  • Determining Probability: Assessing the likelihood of each risk occurring.

  • Evaluating Impact: Understanding the potential consequences of each risk.

  • Assigning Risk Properties: Identifying attributes such as the risk owner.

Risks are often classified based on various parameters like performance, functionality, and reliability. Many organizations are adopting the ISO 25000 standard, which has replaced the ISO 9126 standard for quality characteristics in risk classification. Other companies may use different models, often relying on checklists used during risk identification.

These checklists, widely available and customizable, are essential tools in both identifying and classifying risks. When used effectively, they allow for simultaneous risk classification during the identification process.

To determine the risk level, it’s crucial to assess both the probability of the risk occurring and its potential impact. The probability reflects the likelihood of encountering the issue during testing, and it can be influenced by various technical and organizational factors, such as:

  • The technology and teams involved

  • The training level of key personnel, including business analysts and developers

  • The level of agreement among team members

  • Geographic distribution of teams

  • The approach (traditional vs. modern)

  • Availability and effectiveness of testing tools

  • Strength of leadership

  • Availability of past quality assurance reports

  • Rate of change and early defect detection

  • Issues in interfacing and integration

The impact of a risk, when it materializes, reflects its significance for all stakeholders, including users and consumers. Factors influencing product and project risks include:

  • Frequency of use of the risky feature

  • The feature’s importance to business objectives

  • Potential damage to reputation and business

  • Financial, ecological, or societal liabilities

  • Legal consequences

  • Safety concerns

  • Lack of feasible workarounds

  • Negative publicity due to prominent product failures

Risk levels can be evaluated either qualitatively or quantitatively. If both the probability and impact of a risk are calculated numerically, their product can provide a risk priority number—a quantitative measure. However, in most cases, risk levels are assessed qualitatively, with probability and impact categorized as very low, low, medium, high, or very high.

While qualitative evaluations are common, they may not provide the same precision as quantitative methods. Misusing quantitative evaluations can mislead stakeholders about the true understanding and manageability of risks.

Without broad, statistically validated data, risk analysis often relies on the subjective perspectives of stakeholders like project managers, architects, business analysts, programmers, and testers. These varied opinions can lead to differing views on risk probability and impact.

Therefore, the risk analysis process must include a method for reaching a consensus or establishing an agreed-upon risk level. This could involve management directives or statistical calculations like mean, median, and mode. The risk levels should be well-distributed within the given range to guide decision-making on test case priority, sequence, and effort allocation. Otherwise, the risk levels may fail to serve as effective guides for risk mitigation.

Strategies for Mitigating Quality Risks

Understanding and Managing Quality Risks

The first step in mitigating quality risks is to analyze and evaluate them. Identifying potential risks to product quality lays the foundation for creating effective test plans.

To address these risks, test design, implementation, and execution are carried out according to the test plan. The amount of effort dedicated to these activities is directly proportional to the level of risk involved.

For high-risk areas, detailed testing techniques like pairwise testing are employed. Conversely, for lower-risk areas, simpler techniques such as exploratory testing or equivalence partitioning might be used.

The priority given to test development and execution is also determined by the risk level.

Risk Level Considerations
Risk levels should influence key decisions, such as:

  • Whether project artifacts and test documents should undergo review

  • The degree of tester independence required

  • The experience level needed for testers

  • The amount of retesting and regression testing to be performed

As the project progresses, new information may alter the quality risks or change their impact levels. The test team must stay vigilant to adjust tests as needed, such as identifying new risks, re-evaluating risk levels, and assessing the effectiveness of risk mitigation efforts. These adjustments should occur at key project milestones.

For example, if risk assessment was initially based on requirements specifications, it’s advisable to reassess risks after the design phase is complete.

Another example is when a higher-than-expected number of defects are found in a particular area of the product during testing. In this case, the risk probability for that area should be revised upwards, leading to more extensive testing.

Minimizing Risks Before Testing Begins


Quality risks can be reduced even before test execution starts. If issues are identified during the risk assessment phase, they can be addressed through reviews before subsequent phases of the product development lifecycle. This proactive approach reduces the number of tests required later in the quality risk testing process.

Mastering Lifecycle Risk Management: A Comprehensive Approach

Managing risk effectively is a continual process throughout the entire product development lifecycle. To achieve this, any available documents related to test policies or strategies should address the following:

  • Procedures for managing tests associated with project and product risks

  • Integration of risk management across all testing levels

  • Impact of risk management on different testing stages

In organizations with seasoned experience, project teams are well-versed in identifying and addressing risks at various levels, extending beyond just testing. In these settings, critical risks are addressed promptly upon identification.

For example, if performance is identified as a risk factor for product quality, performance testing is conducted at multiple stages, including design, unit, and integration testing.

Such organizations go beyond merely identifying risks. They also determine the sources and potential consequences of these risks. Root cause analysis is often employed to gain deeper insights into risk origins and to implement process improvements to prevent defects. Risk mitigation is an ongoing practice throughout the lifecycle.

In mature organizations, risk analysis encompasses several factors, including:

  • Related work activities

  • System behavior analysis

  • Cost-based risk assessment

  • Product risk evaluation

  • End-user risk analysis

  • Liability risk assessment

Risk analysis in these organizations extends beyond software testing. The testing team contributes to risk analysis for the entire program.

Risk-based testing techniques often combine methods to prioritize and sequence tests based on risk levels. This approach ensures that critical defects are identified during test execution and that key components of the product are thoroughly evaluated.

In some cases, high-risk tests are executed before low-risk tests, following a depth-first risk testing approach. Alternatively, a breadth-first testing technique might be used, where a sample group of tests is run across all predefined risk areas to ensure coverage.

Depending on the chosen testing process—whether breadth-first or depth-first—the allotted time for testing might be exhausted before all tests are completed. After conducting risk-based tests, testers report the remaining risk levels to management, helping them decide whether additional testing is necessary.

If further testing is not undertaken, remaining risks should be managed by customers, end users, technical support, or operational staff.

Throughout the testing phase, risk-based testing allows project managers, product managers, senior managers, and stakeholders to monitor and manage the development lifecycle. This oversight supports informed decisions regarding product release based on remaining risk levels.

To facilitate stakeholder monitoring, the Test Manager must present risk-based testing results in a clear and comprehensible manner.

Effective Project Risk Management

When planning project testing, it’s crucial to address potential risks associated with the project. The process for identifying these risks is detailed in the earlier section on risk identification.

Once risks are identified, they should be communicated to the project manager, who will take appropriate steps to mitigate them as effectively as possible.

Although the test team may not be able to eliminate all risks, they can manage:

  • Testing Environment Readiness: Ensuring that the testing environment is prepared and functional.
  • Testing Tool Availability: Confirming that the necessary testing tools are available and operational.
  • Qualified Testing Staff: Having skilled professionals available for testing tasks.
  • Testing Standards and Techniques: Addressing gaps in standards, techniques, and rules.

Managing project risks involves:

  • Organizing Testware: Structuring and preparing test resources effectively.

  • Testing Environments in Advance: Ensuring environments are tested before use.

  • Testing Preliminary Versions: Assessing early versions of the product.

  • Challenging Test Conditions: Implementing rigorous test scenarios.

  • Adhering to Testability Requirements: Following strict testability criteria.

  • Participating in Reviews: Being involved in reviews of preliminary project deliverables.

  • Managing Changes Based on Defects: Adjusting the project based on defect discoveries.

  • Monitoring Progress and Quality: Regularly reviewing project progress and product quality.

After identifying and analyzing risks, there are four main strategies to manage them:

  • Preventive Measures: Actions to reduce the likelihood and/or impact of risks.

  • Emergency Plans: Strategies to handle risks if they occur.

  • Risk Transfer: Shifting responsibility for risk management to a third party.

  • Acceptance: Acknowledging and accepting the risk as is.

When selecting the best approach, consider:

  • Advantages and Disadvantages: Weighing the pros and cons of each option.

  • Cost of Implementation: Evaluating the expense involved in each option.

  • Additional Risks: Identifying any new risks associated with each choice.

For contingency plans, ensure that risk triggers and plan ownership are clearly defined in advance.